The Quy Nhon City’s Management board for The Environmental Sanitation Program (ESP) has taken measures to speed up the implementation of 3 contract packages that ensures to complete them on schedule.
These contract packages include QN-1.5A2 collecting wastewater in the south of city, QN-1.3A controlling floods and rain-water drainage system in the 2nd period, and QN-1.5A1 collecting wastewater in the north of city.
Besides, other 2 contract packages under the invitation of bids include QN-1.3C controlling floods and rain-water drainage system in the north of city, and QN-1.3B controlling floods and rain-water drainage system in the centre of city.
|