Ha Thanh cable-stayed bridge to be built
13:33', 9/3/ 2012 (GMT+7)

A cable-stayed bridge is expected to be built in Quy Nhon this year, crossing the Ha Thanh River, according a proposal presented by HTC trading and consultancy Co., Ltd.

The bridge is designed with one tower and the width of 5 meters. There are lights decorating the bridge, let alone other decorations and parking spot at both ends of the bridge.

The construction is estimated to cost nearly 10 billion VND.

  • Phi Hung
Print page  Send feedback

THE OTHER NEWS >>
Women honored on their day  (08/03/2012)
Vietnam Photography Day prepared for celebration  (08/03/2012)
Int’l Women’s Day celebrated across province  (07/03/2012)
11 junior high schools get national cerfitication  (06/03/2012)
Binh Dinh sees 3 zones for entrance exam enrollment  (06/03/2012)
20 tons of Viet GAP-certified vegetable consumed  (05/03/2012)
Pray for the peace of 11 lost fishermen’s soul  (04/03/2012)
Vinh Thanh comes 1st in “Our Vietnamese language” contest  (04/03/2012)
DRR gets positive results  (04/03/2012)
Long Van – Long My route requires about 996 bln VND  (29/02/2012)
Environment protection fund set up  (29/02/2012)
Planning for Quy Nhon train station, adjacent areas ratified  (29/02/2012)
3 traffic signal systems to install  (27/02/2012)
Two more primary schools meet 2nd level national standard  (27/02/2012)
VND4 bln invested in infrastructure for island or peninsula communes  (21/02/2012)